Project details
Begin date: | 2021 |
End date: | 2022 |
City: | com. Dumbrăvița, jud. Timiș |
Case study
Construction center with commercial functions, of services, offices and other complementary functions, parking lots, car and pedestrian alleys, accesses, green spaces, navigation totem location with a height of 40 m and advertising signals, geothermal pump installation, photovoltaic panel installation, municipal network works, connections, post-trafo location, vertical systematization, site organization.
The main construction with mall function will be developed on the high ground floor and a partial above ground level.
Project area: 26000 sqm.
Photo gallery