Production of steel structures
The steel structures necessary to accomplish the contracted objectives is carried out in a factory achieved with own resources in surface of 6000 square meters with the destination of metal confections factory, equipped with new and modern equipment.
The production capacity is approximately 500-700 tons/month and is performed using the following equipment:
- Pellet blast cleaning equipment with 6 Turbine
- 3-axis automatic drill DANOBAT
- Metal sheet cutting machine with plasma and oxyfuel
- Cutting machine
- CNC Drill
- Semiautomatic MIG MAG welding machines
- Automatic welding machine with under flow bed
- Installation for painting AIR LESS
- Lathes
- Mills
- Hydraulic presses
- Guillotines
- Sanders
- Grinders
- Sheet bending
- Overhead cranes